Project: Primesite
Value: £1,297,000
Programme: 32 weeks
The Primesite project consisted of the demolition of the existing garage and buildings and full re-development of the site, with the design and construction of a 10,000 ft2 office space in two blocks with associated roadworks and retaining walls
![](https://tgbeighton.co.uk/wp-content/uploads/2016/05/primesite-1-1-1024x683.jpg)