Skip to content
TGBeighton Logo
T: 01246 201930
E: enquiries@tgbeighton.co.uk
  • Projects
  • After Care
  • Health & Safety
  • News
  • Testimonials
  • Contact Us

Project Category: Commercial Build

Alkane

TGB started work in January 2012 on a new single storey utility building for Alkane at Markham Energy Park, just of the M1 Jnctn 29A. The new buidling was designed as an extension to the existing building.  All associated external works were carried out, i.e. the drainage, a new concrete yard and the duct work for the services.  The building, was completed on time and within budget in the Spring of 2012. It was fitted out and decorated and includes full under floor heating.  A new foundation has also been laid to house a new pump house

Alkane

at Markham Energy Park

1/1

Broombank

The design and construction of a mixed use development to provide thirteen industrial/warehouse units totalling 45,000 ft2  and five two storey office units giving 6000 ft2  of office space. External works including five metre high retaining walls and reinforced earth banks were neccesary on this site together with drilling and grouting of old mine workings.

Broombank

Business Park

1/1

Conren Ltd

An office refurbishment, followed by extension to mezzanine floor. This was completed on schedule in the Spring of 2012

Conren Ltd

Conren

1/1

Molyneux

Molyneux business park in Darley Dale was a complete refurbishment and extension of an existing mill to create a new prestigious office space.

Molyneux

Business Park

1/1

Peak UK Kayaking Co Ltd

Peak UK Kayaking was completed on time and in time for production of Kayaking kit in readiness for the London Olympic Games 2012

The photographs alongside right show exterior shots and interior shots of the offices, plus the machinist area and the mezzanine floor.

Peak UK Kayaking Co Ltd

Darley Dale

1/1

Primesite

The Primesite project consisted of the demolition of the existing garage and buildings and full re-development of the site, with the design and construction of a 10,000 ft2 office space in two blocks with associated roadworks and retaining walls

Primesite

Primesite

1/1

Utopia

A £1.1m project comprising the design and construction of a new 15,000ft2, 16m high extension to the existing warehouse with DM1 floor slab together with concrete service yards for lorry loading and parking. The construction took place around Utopias operations ensuring they were able to fully utilise the existing warehouse throughout the 18 week contract period.

Utopia

The Tableware Company

1/1

TGBeighton Ltd

McGregors Way
Turnoaks Business Park
Chesterfield
S40 2WB
Tel. 01246 201930

Chas Logo
British Safety Council Logo
  • Projects
  • After Care
  • Health & Safety
  • News
  • Testimonials
  • Contact Us
T: 01246 201930
E: enquiries@tgbeighton.co.uk